Please use this identifier to cite or link to this item: http://repositorio.inesctec.pt/handle/123456789/5900
Title: A note on "the capacited lot-sizing and scheduling problem with sequence-dependent setup costs and setup times"
Authors: Maria Antónia Carravilla
Bernardo Almada-Lobo
José Fernando Oliveira
Issue Date: 2008
Abstract: Abstract Gupta and Magnusson [The capacitated lot-sizing and scheduling problem with sequence-dependent setup costs and setup times. Computers and Operations Research 2005;32(4):727–47] develop a model for the single machine capacitated lot-sizing and scheduling problem (CLSP) with sequence dependent setup times and setup costs, incorporating all the usual features of setup carryovers. In this note we show that this model does not avoid disconnected subtours. A new set of constraints is added to the model to provide an exact formulation for this problem.
URI: http://repositorio.inesctec.pt/handle/123456789/5900
metadata.dc.type: article
Publication
Appears in Collections:CESE - Articles in International Journals

Files in This Item:
File Description SizeFormat 
PS-05763.pdf
  Restricted Access
185.19 kBAdobe PDFThumbnail
View/Open Request a copy


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.