Optimization of Cascaded Hydro Units Modeled as Price Makers Using the linprog Function of MATLAB (R) and Considering the Tailwater Effect
Optimization of Cascaded Hydro Units Modeled as Price Makers Using the linprog Function of MATLAB (R) and Considering the Tailwater Effect
Date
2017
Authors
Silva e Castro,MSE
João Tomé Saraiva
Journal Title
Journal ISSN
Volume Title
Publisher
Abstract
This paper describes an enhanced model for the Short Term Hydro Scheduling Problem, HSP, that includes the impact of operation decisions on the market prices and the possibility of adjusting the tailwater level. Additionally, the efficiency of hydraulic turbines is treated as a variable dependent on the discharged flows. The developed solution algorithm uses an iterative approach that solves in each iteration a linearized HSP problem using the linprog function of the MATLAB (R) Optimization Toolbox. In each iteration, the value of the head to use in the next iteration is updated. The paper reports results from a realistic Case Study based on the cascade of 9 hydro stations (4 of them with pumping) installed in the Portuguese section of the Douro River.