Net load forecasting in presence of renewable power curtailment

Thumbnail Image
Date
2016
Authors
Fonte,PM
Monteiro,C
Fernando Maciel Barbosa
Journal Title
Journal ISSN
Volume Title
Publisher
Abstract
This paper analyzes a real case study based on an islanding power grid, where there is wind power curtailment during the grid operation. This curtailment skews the wind power production database creating a huge challenge to the overall power production forecast. Thus, it is presented a solution which has allowed more accurate forecasts in order to improve the renewable production and reduce the fuel consumption in thermal power plants. The proposed filtering approach demonstrated to be a good solution allowing wind power forecasts with less error and net load forecasts with more accuracy.
Description
Keywords
Citation