Artificial Neural Networks Applied to an Earthwork Construction Database

dc.contributor.author Manuel Afonso Parente en
dc.contributor.author Correia,AG en
dc.contributor.author Cortez,P en
dc.date.accessioned 2018-01-16T15:11:50Z
dc.date.available 2018-01-16T15:11:50Z
dc.date.issued 2014 en
dc.description.abstract This paper presents a study based on the application of cascade ANN prediction models to an earthwork construction database. Results show not only a good adjustment to the data, but also the influence of each earthwork construction process on the work rate of the global production line. Furthermore, the obtained results emphasize the importance of optimal resource allocation and management throughout earthwork construction phases. Following this framework, the study concludes with a demonstration of how the developed models can be integrated into a more complex system in order to pursue that purpose. en
dc.identifier.uri http://repositorio.inesctec.pt/handle/123456789/6378
dc.identifier.uri http://dx.doi.org/10.3233/978-1-61499-417-6-200 en
dc.language eng en
dc.relation 7032 en
dc.rights info:eu-repo/semantics/openAccess en
dc.title Artificial Neural Networks Applied to an Earthwork Construction Database en
dc.type conferenceObject en
dc.type Publication en
Files
Original bundle
Now showing 1 - 1 of 1
Thumbnail Image
Name:
P-00N-B55.pdf
Size:
802.22 KB
Format:
Adobe Portable Document Format
Description: