Technical and Economic Assessment for Optimal Sizing of Distributed Storage

dc.contributor.author Ismael Miranda en
dc.contributor.author Nuno Silva en
dc.contributor.author Hélder Leite en
dc.date.accessioned 2017-11-17T11:59:50Z
dc.date.available 2017-11-17T11:59:50Z
dc.date.issued 2012 en
dc.description.abstract The introduction of renewable sources poses new challenges to power systems operation. Their impact on distribution networks urges the need of a more flexible grid that can ensure high reliability and power quality as well as operational efficiency. Distributed storage systems may address those emerging challenges by covering operational needs of power, response time and energy. This paper describes a methodology for optimal sizing of distributed storage through technical and economic assessment and storage scheduling optimization. A case study synopsis of voltage regulation and renewable energy time-shift application to LV and MV networks is presented. en
dc.identifier.uri http://repositorio.inesctec.pt/handle/123456789/3344
dc.language eng en
dc.relation 4664 en
dc.rights info:eu-repo/semantics/openAccess en
dc.title Technical and Economic Assessment for Optimal Sizing of Distributed Storage en
dc.type conferenceObject en
dc.type Publication en
Files