Unit Commitment and Dispatch Strategies for a Wind Park

dc.contributor.author João Peças Lopes en
dc.contributor.author Carlos Fabian Moyano en
dc.date.accessioned 2017-11-17T09:36:24Z
dc.date.available 2017-11-17T09:36:24Z
dc.date.issued 2007 en
dc.description.abstract This paper presents an optimization strategy to be adopted at wind park control level. This approach transposes the classical formulations of a unit commitment and a generator dispatch problem to the turbines of a wind park, assuming that variable speed wind turbines are installed, and considering that wind speed forecasts are available. Wind speed forecasts, demands from grid operators or generation levels defined to comply with market strategies are the inputs of the problem. A small example is used to illustrate the proposed approach. en
dc.identifier.uri http://repositorio.inesctec.pt/handle/123456789/3053
dc.language eng en
dc.relation 1103 en
dc.rights info:eu-repo/semantics/openAccess en
dc.title Unit Commitment and Dispatch Strategies for a Wind Park en
dc.type conferenceObject en
dc.type Publication en
Files