Title: A constructive heuristic for staff scheduling in the glass industry
Authors: Rocha,M
José Fernando Oliveira
Maria Antónia Carravilla
Issue Date: 2014
Abstract: In this paper a constructive heuristic for solving the staff scheduling problem of a glass manufacture unit is proposed. Based on simple calculations and algorithms, the developed procedure assigns working shifts and days-off to teams of employees, ensuring the satisfaction of a mandatory sequence of working shifts and the balance of the workload between employees. The computational times for the experiments with the case study company, with three eight-hour working shifts and five teams of employees, fell consistently below 5 seconds for a set of different planning periods. Results are compared with the ones achieved with an optimization model (MIP), demonstrating the good performance of the heuristic, also in terms of the quality of the achieved solutions. The heuristic rarely fails to produce a feasible solution and whenever the solution is feasible then it is also optimal. When tackling problems with a large number of teams, the heuristic maintains the good performance while the MIP model is not able to find any solution within 16 hours of running time. Although it was designed for a particular problem of the glass industry, tests show that the heuristic is flexible enough to be applied to problems with different features, from other activity sectors, encouraging further extensions of this work.
URI: http://repositorio.inesctec.pt/handle/123456789/3518
http://dx.doi.org/10.1007/s10479-013-1525-y
metadata.dc.type: article
Publication
Appears in Collections:CEGI - Articles in International Journals

Files in This Item:
File Description SizeFormat 
P-009-HKS.pdf
  Restricted Access
850.21 kBAdobe PDFView/Open Request a copy


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.