Please use this identifier to cite or link to this item: http://repositorio.inesctec.pt/handle/123456789/5945
Title: Hierarchical scheduling of continuous casters and hot strip mills in the steel industry: a block planning application
Authors: Mattik,I
Pedro Amorim
Guenther,HO
Issue Date: 2014
Abstract: This work addresses the joint scheduling of continuous caster and hot strip mill processes in the steel industry. Traditionally, slab yards are used to decouple these two stages. However, the rising importance of energy costs and reduced logistic effort gives motivation for a combined scheduling. For each of the processes, a mixed-integer linear optimisation model based on the block planning principle is presented. This approach develops production schedules that take technological sequences of steel grades and milling programmes into account. We consider the integrated steel plant of an international steel company as a case study. Numerical results demonstrate the practicability of this approach under experimental conditions, which reflect typical settings from an industrial application in the steel industry.
URI: http://repositorio.inesctec.pt/handle/123456789/5945
http://dx.doi.org/10.1080/00207543.2013.860248
metadata.dc.type: article
Publication
Appears in Collections:CEGI - Articles in International Journals

Files in This Item:
File Description SizeFormat 
P-009-7RJ.pdf
  Restricted Access
464.13 kBAdobe PDFThumbnail
View/Open Request a copy


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.