Scheduling wafer slicing by multi-wire saw manufacturing in photovoltaic industry: a case study
Scheduling wafer slicing by multi-wire saw manufacturing in photovoltaic industry: a case study
dc.contributor.author | Rui Santos | en |
dc.contributor.author | Bernardo Almada-Lobo | en |
dc.contributor.author | Luís Guimarães | en |
dc.date.accessioned | 2017-11-16T14:07:36Z | |
dc.date.available | 2017-11-16T14:07:36Z | |
dc.date.issued | 2011 | en |
dc.description.abstract | en | |
dc.identifier.uri | http://repositorio.inesctec.pt/handle/123456789/2786 | |
dc.identifier.uri | http://dx.doi.org/10.1007/s00170-010-2906-x | en |
dc.language | eng | en |
dc.relation | 5428 | en |
dc.relation | 5965 | en |
dc.rights | info:eu-repo/semantics/embargoedAccess | en |
dc.title | Scheduling wafer slicing by multi-wire saw manufacturing in photovoltaic industry: a case study | en |
dc.type | article | en |
dc.type | Publication | en |