Setting the Maximum Import Net Transfer Capacity under Extreme RES Integration Scenarios
Setting the Maximum Import Net Transfer Capacity under Extreme RES Integration Scenarios
dc.contributor.author | Manuel Matos | en |
dc.contributor.author | Ricardo Jorge Bessa | en |
dc.contributor.author | Carla Silva Gonçalves | en |
dc.contributor.author | Laura Luciana Cavalcante | en |
dc.contributor.author | Vladimiro Miranda | en |
dc.contributor.author | Machado,N | en |
dc.contributor.author | Marques,P | en |
dc.contributor.author | Matos,F | en |
dc.date.accessioned | 2018-01-05T19:18:08Z | |
dc.date.available | 2018-01-05T19:18:08Z | |
dc.date.issued | 2016 | en |
dc.description.abstract | In order to reduce the curtailment of renewable generation in periods of low load, operators can limit the import net transfer capacity (NTC) of interconnections. This paper presents a probabilistic approach to support the operator in setting the maximum import NTC value in a way that the risk of curtailment remains below a pre-specified threshold. Main inputs are the probabilistic forecasts of wind power and solar PV generation, and special care is taken regarding the tails of the global margin distribution (all generation all loads and pumping), since the accepted thresholds are generally very low. Two techniques are used for this purpose: interpolation with exponential functions and nonparametric estimation of extreme conditional quantiles using extreme value theory. The methodology is applied to five representative days, where situations ranging from high maximum NTC values to NTC=0 are addressed. Comparison of the two techniques for modeling tails is also comprised. | en |
dc.identifier.uri | http://repositorio.inesctec.pt/handle/123456789/5591 | |
dc.identifier.uri | http://dx.doi.org/10.1109/pmaps.2016.7764145 | en |
dc.language | eng | en |
dc.relation | 208 | en |
dc.relation | 6477 | en |
dc.relation | 6595 | en |
dc.relation | 4882 | en |
dc.relation | 214 | en |
dc.rights | info:eu-repo/semantics/openAccess | en |
dc.title | Setting the Maximum Import Net Transfer Capacity under Extreme RES Integration Scenarios | en |
dc.type | conferenceObject | en |
dc.type | Publication | en |
Files
Original bundle
1 - 1 of 1