Mono-stage formulations for the soft drink production process with two synchronized stages [Formulações monoestágio para o problema de programação da produção de bebidas dois estágios com sincronia]

dc.contributor.author Ferreira,D en
dc.contributor.author Bernardo Almada-Lobo en
dc.contributor.author Morabito,R en
dc.date.accessioned 2018-01-16T15:25:23Z
dc.date.available 2018-01-16T15:25:23Z
dc.date.issued 2013 en
dc.description.abstract In this work we present single-stage formulations for the integrated soft drink lot-sizing and scheduling problem with two-stage synchronization. It is a multi-product, multi-machine problem, with sequence-dependent setup times and costs. Without loss of generality, these single-stage reformulations address the problem correctly and, in general, reduce the size of the synchronized two-stage model of Ferreira, Morabito e Rangel (2009), regarding the number of variables and constraints. The preliminary computational experiments on real-world instances from a soft-drink company show the competitiveness of the single-stage models against other formulations and solution approaches reported in the literature. en
dc.identifier.uri http://repositorio.inesctec.pt/handle/123456789/6399
dc.identifier.uri http://dx.doi.org/10.1590/s0103-65132011005000068 en
dc.language eng en
dc.relation 5428 en
dc.rights info:eu-repo/semantics/embargoedAccess en
dc.title Mono-stage formulations for the soft drink production process with two synchronized stages [Formulações monoestágio para o problema de programação da produção de bebidas dois estágios com sincronia] en
dc.type article en
dc.type Publication en
Files
Original bundle
Now showing 1 - 1 of 1
No Thumbnail Available
Name:
P-008-CCM.pdf
Size:
628.64 KB
Format:
Adobe Portable Document Format
Description: