Multiyear and Multi-Criteria AC Transmission Expansion Planning Model Considering Reliability and Investment Costs
Multiyear and Multi-Criteria AC Transmission Expansion Planning Model Considering Reliability and Investment Costs
dc.contributor.author | Phillipe Vilaça Gomes | en |
dc.contributor.author | João Vieira Silva | en |
dc.contributor.author | João Tomé Saraiva | en |
dc.date.accessioned | 2017-12-14T09:30:26Z | |
dc.date.available | 2017-12-14T09:30:26Z | |
dc.date.issued | 2016 | en |
dc.description.abstract | One of the major concerns in Power Systems is surely related with their reliability. Long-term expansion planning studies traditionally use the well-known deterministic "N-1" contingency criterion. However, this criterion is applied based on worst-case analyses and the obtained plan may originate over-investments. Differently, probabilistic reliability approaches can incorporate different type of uncertainties that affect power systems. In this work, a long term multi-criteria AC Transmission Expansion Planning model was developed considering two objectives - the probabilistic reliability index Expected Energy Not Supplied (EENS) and the investment cost. The Pareto-Front associated with these two objectives was obtained using Genetic Algorithms and the final solution was selected using a fuzzy decision making function. This approach was applied to the IEEE 24 Bus Test System and the results ensure its robustness and efficiency. | en |
dc.identifier.uri | http://repositorio.inesctec.pt/handle/123456789/4010 | |
dc.identifier.uri | http://dx.doi.org/10.1109/eem.2016.7521182 | en |
dc.language | eng | en |
dc.relation | 6297 | en |
dc.relation | 6299 | en |
dc.relation | 268 | en |
dc.rights | info:eu-repo/semantics/openAccess | en |
dc.title | Multiyear and Multi-Criteria AC Transmission Expansion Planning Model Considering Reliability and Investment Costs | en |
dc.type | conferenceObject | en |
dc.type | Publication | en |