A Unit Commitment and Dispatch for a Wind Park Considering Wind Power Forecast

dc.contributor.author Carlos Fabian Moyano en
dc.contributor.author João Peças Lopes en
dc.date.accessioned 2017-11-16T12:23:03Z
dc.date.available 2017-11-16T12:23:03Z
dc.date.issued 2007 en
dc.description.abstract The present paper describes an optimization strategy, to be adopted at the wind park control level, especially for those with large power output, that allow to define the commitment of the wind turbines and their active and reactive set points following requests from the wind park dispatch centers, assuming that individual wind turbines short term wind power forecasts are known and are expressed as power availability. This approach was also developed with a concern on the minimization of the connection / disconnection of the individual wind generators, for a given time horizon, and takes also into account restrictions in the limits for reactive power generated at the wind turbines. en
dc.identifier.uri http://repositorio.inesctec.pt/handle/123456789/1453
dc.language eng en
dc.relation 1103 en
dc.rights info:eu-repo/semantics/openAccess en
dc.title A Unit Commitment and Dispatch for a Wind Park Considering Wind Power Forecast en
dc.type conferenceObject en
dc.type Publication en
Files