A Simulated Annealing Based Approach to Solve the Generator Maintenance Scheduling Problem

dc.contributor.author João Tomé Saraiva en
dc.contributor.author José Carlos Sousa en
dc.contributor.author Marcelo Leandro Pereira en
dc.contributor.author Virgilio Torrado Mendes en
dc.date.accessioned 2017-11-16T13:15:52Z
dc.date.available 2017-11-16T13:15:52Z
dc.date.issued 2011 en
dc.description.abstract The scheduling of maintenance actions of generators is not a new problem but gained in recent years a new interest with the advent of electricity markets because inadequate schedules can have a significative impact on the revenues of generation companies. In this paper we report the research on this topic developed during the preparation of the MSc Thesis of the second author. The scheduling problem of generator maintenance actions is formulated as a mixed integer optimization problem in which we aim at minimizing the operation cost along the scheduling period plus a penalty on energy not supplied. This objective function is subjected to a number of constraints detailed in the paper and it includes binary variables to indicate that a generator is in maintenance in a given week. This optimisation problem was solved using Simulated Annealing. Simulated Annealing is a very appealing metaheuristic easily implemented and providing good results in numerous optimization problems. The paper includes results obtained for a Case Study based on a realistic generation system that includes 29 generation groups. This research work was proposed and developed with the collaboration of the third and fourth authors, from EDP Produção, Portugal. en
dc.identifier.uri http://repositorio.inesctec.pt/handle/123456789/2139
dc.language eng en
dc.relation 268 en
dc.rights info:eu-repo/semantics/openAccess en
dc.title A Simulated Annealing Based Approach to Solve the Generator Maintenance Scheduling Problem en
dc.type article en
dc.type Publication en
Files