Single-stage formulations for synchronised two-stage lot sizing and scheduling in soft drink production
Single-stage formulations for synchronised two-stage lot sizing and scheduling in soft drink production
dc.contributor.author | Reinaldo Morabito | en |
dc.contributor.author | Bernardo Almada-Lobo | en |
dc.contributor.author | Deisemara Ferreira | en |
dc.contributor.author | Alistair Clark | en |
dc.date.accessioned | 2017-11-16T14:07:53Z | |
dc.date.available | 2017-11-16T14:07:53Z | |
dc.date.issued | 2012 | en |
dc.description.abstract | en | |
dc.identifier.uri | http://repositorio.inesctec.pt/handle/123456789/2790 | |
dc.language | eng | en |
dc.relation | 5428 | en |
dc.rights | info:eu-repo/semantics/embargoedAccess | en |
dc.title | Single-stage formulations for synchronised two-stage lot sizing and scheduling in soft drink production | en |
dc.type | article | en |
dc.type | Publication | en |