How to Prepare a Power System for 15% Wind Energy Penetration: the Portuguese Case Study

dc.contributor.author Reis Rodrigues en
dc.contributor.author João Ricardo en
dc.contributor.author Medeiros Pinto en
dc.contributor.author João Peças Lopes en
dc.contributor.author Ana Estanqueiro en
dc.contributor.author Rui Castro en
dc.contributor.author Pedro Flores en
dc.date.accessioned 2017-11-16T12:29:34Z
dc.date.available 2017-11-16T12:29:34Z
dc.date.issued 2008 en
dc.description.abstract The 2001/77/CE Renewable Energies European Directive together with Kyoto Protocol ratification supported by a government vision and strong objective on the reduction of external oil dependence put Portugal in the front line to achieve one of the highest wind energy penetrations within 10 years? time. This paper gives a summarized overview of the Portuguese technical approaches and methodologies followed in order to plan and accommodate the ambitious wind power goals to 2010/2013, preserving the overall quality of the power system. en
dc.identifier.uri http://repositorio.inesctec.pt/handle/123456789/1537
dc.language eng en
dc.relation 1103 en
dc.rights info:eu-repo/semantics/openAccess en
dc.title How to Prepare a Power System for 15% Wind Energy Penetration: the Portuguese Case Study en
dc.type article en
dc.type Publication en
Files