Cyclic staff scheduling: optimization models for some real-life problems

dc.contributor.author Rocha,M en
dc.contributor.author José Fernando Oliveira en
dc.contributor.author Maria Antónia Carravilla en
dc.date.accessioned 2018-01-09T11:40:34Z
dc.date.available 2018-01-09T11:40:34Z
dc.date.issued 2013 en
dc.description.abstract In this work, we propose a general integer programming model to address the staff scheduling problem, flexible enough to be easily adapted to a wide-range of real-world problems. The model is applied with slight changes to two case studies: a glass plant and a continuous care unit, and also to a collection of benchmark instances available in the literature. The emphasis of our approach is on a novel formulation of sequence constraints and also on workload balance, which is tackled through cyclic scheduling. Models are solved using the CPLEX solver. Computational results indicate that optimal solutions can be achieved within a reasonable amount of time. en
dc.identifier.uri http://repositorio.inesctec.pt/handle/123456789/5764
dc.identifier.uri http://dx.doi.org/10.1007/s10951-012-0299-4 en
dc.language eng en
dc.relation 1297 en
dc.relation 265 en
dc.rights info:eu-repo/semantics/embargoedAccess en
dc.title Cyclic staff scheduling: optimization models for some real-life problems en
dc.type article en
dc.type Publication en
Files
Original bundle
Now showing 1 - 1 of 1
Thumbnail Image
Name:
P-005-2D3.pdf
Size:
5.35 MB
Format:
Adobe Portable Document Format
Description: