Lead time considerations for the multi-level capacitated lot-sizing problem

dc.contributor.author Almeder,C en
dc.contributor.author Klabjan,D en
dc.contributor.author Traxler,R en
dc.contributor.author Bernardo Almada-Lobo en
dc.date.accessioned 2018-01-16T15:13:09Z
dc.date.available 2018-01-16T15:13:09Z
dc.date.issued 2015 en
dc.description.abstract The classical multi-level capacitated lot-sizing problem formulation is often not suitable to correctly capture resource requirements and precedence relations. Depending on lead time assumptions, either the model provides infeasible production plans or plans with costly needless inventory. We tackle this issue by explicitly modeling these two aspects and the synchronization of batches of products in the multi-level lot-sizing and scheduling formulation. Two models are presented; one considering batch production and the other one allowing lot-streaming. Comparisons with traditional models demonstrate the capability of the new approach in delivering more realistic results. The generated production plans are always feasible and cost savings of 30-40 percent compared to classical models are observed. en
dc.identifier.uri http://repositorio.inesctec.pt/handle/123456789/6382
dc.identifier.uri http://dx.doi.org/10.1016/j.ejor.2014.09.030 en
dc.language eng en
dc.relation 5428 en
dc.rights info:eu-repo/semantics/embargoedAccess en
dc.title Lead time considerations for the multi-level capacitated lot-sizing problem en
dc.type article en
dc.type Publication en
Files
Original bundle
Now showing 1 - 1 of 1
No Thumbnail Available
Name:
P-00A-4AX.pdf
Size:
271.61 KB
Format:
Adobe Portable Document Format
Description: