Please use this identifier to cite or link to this item: http://repositorio.inesctec.pt/handle/123456789/5986
Full metadata record
DC FieldValueLanguage
dc.contributor.authorFaria,Pen
dc.contributor.authorVale,Zen
dc.contributor.authorJosé Ribeiro Baptistaen
dc.date.accessioned2018-01-12T17:50:55Z-
dc.date.available2018-01-12T17:50:55Z-
dc.date.issued2015en
dc.identifier.urihttp://repositorio.inesctec.pt/handle/123456789/5986-
dc.identifier.urihttp://dx.doi.org/10.1016/j.enconman.2015.01.028en
dc.description.abstractDemand response concept has been gaining increasing importance while the success of several recent implementations makes this resource benefits unquestionable. This happens in a power systems operation environment that also considers an intensive use of distributed generation. However, more adequate approaches and models are needed in order to address the small size consumers and producers aggregation, while taking into account these resources goals. The present paper focuses on the demand response programs and distributed generation resources management by a Virtual Power Player that optimally aims to minimize its operation costs taking the consumption shifting constraints into account. The impact of the consumption shifting in the distributed generation resources schedule is also considered. The methodology is applied to three scenarios based on 218 consumers and 4 types of distributed generation, in a time frame of 96 periods.en
dc.languageengen
dc.relation5846en
dc.rightsinfo:eu-repo/semantics/openAccessen
dc.titleConstrained consumption shifting management in the distributed energy resources scheduling considering demand responseen
dc.typearticleen
dc.typePublicationen
Appears in Collections:Non INESC TEC publications - Articles in International Journals

Files in This Item:
File Description SizeFormat 
P-00A-90G.pdf2.69 MBAdobe PDFThumbnail
View/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.