Title: Assessing low voltage network constraints in distributed energy resources planning
Authors: Calvillo,CF
Sanchez Miralles,A
José Villar
Issue Date: 2015
Abstract: Many efforts are being devoted towards achieving optimal planning and operation of DER (Distributed Energy Resources). However, during the planning process, not all relevant thermal constraints of the distribution network are considered; some works claim that they must be taken into account, while others follow the single-node approach. This paper assesses the effects of the distribution network thermal constraints in DER planning, using a deterministic linear programming problem to find the optimal DER planning and operation. Three case studies with different network topologies under several DER implementation scenarios are analyzed. A DC load flow is used to estimate the required network reinforcements to accommodate optimal DER investments, if any. Reinforcement costs are then calculated to assess the net benefit compared to limiting DER investments and operation, according to the network thermal limits. Results suggest that there is no significant economic advantage in limiting DER investments and line flows, compared to reinforcing the low voltage network to allow the larger flows that result from an unconstrained network problem.
URI: http://repositorio.inesctec.pt/handle/123456789/6102
http://dx.doi.org/10.1016/j.energy.2015.03.044
metadata.dc.type: article
Publication
Appears in Collections:Non INESC TEC publications - Articles in International Journals

Files in This Item:
File Description SizeFormat 
P-00N-AXD.pdf1.53 MBAdobe PDFThumbnail
View/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.