Simultaneous regular and non-regular production scheduling of multipurpose batch plants: A real chemical-pharmaceutical case study
Simultaneous regular and non-regular production scheduling of multipurpose batch plants: A real chemical-pharmaceutical case study
dc.contributor.author | Samuel Moniz | en |
dc.contributor.author | Barbosa Povoa,AP | en |
dc.contributor.author | de Sousa,JP | en |
dc.date.accessioned | 2017-12-20T15:28:25Z | |
dc.date.available | 2017-12-20T15:28:25Z | |
dc.date.issued | 2014 | en |
dc.description.abstract | Regular and non-regular production can often be found in multipurpose batch plants, requiring two distinct operating strategies: campaign and short-term production. This paper proposes a solution approach for simultaneous scheduling of campaign and short-term products in multipurpose batch plants. Regular products follow a cyclic schedule and must cover several product deliveries during the scheduling horizon, while non-regular products have a non-cyclic schedule. The proposed approach explores the Resource-Task Network (RTN) discrete-time formulation. Moreover, a rolling horizon approach, and reformulation and branching strategies have been applied to deal with the computational complexity of the scheduling problem. Real case instances of a chemical-pharmaceutical industry are solved, showing the applicability of the solution approach. | en |
dc.identifier.uri | http://repositorio.inesctec.pt/handle/123456789/4479 | |
dc.identifier.uri | http://dx.doi.org/10.1016/j.compchemeng.2014.03.017 | en |
dc.language | eng | en |
dc.relation | 4694 | en |
dc.rights | info:eu-repo/semantics/openAccess | en |
dc.title | Simultaneous regular and non-regular production scheduling of multipurpose batch plants: A real chemical-pharmaceutical case study | en |
dc.type | article | en |
dc.type | Publication | en |
Files
Original bundle
1 - 1 of 1