Optimization of Cascaded Hydro Units Modeled as Price Makers Using the linprog Function of MATLAB (R) and Considering the Tailwater Effect

dc.contributor.author Silva e Castro,MSE en
dc.contributor.author João Tomé Saraiva en
dc.date.accessioned 2017-12-26T10:11:32Z
dc.date.available 2017-12-26T10:11:32Z
dc.date.issued 2017 en
dc.description.abstract This paper describes an enhanced model for the Short Term Hydro Scheduling Problem, HSP, that includes the impact of operation decisions on the market prices and the possibility of adjusting the tailwater level. Additionally, the efficiency of hydraulic turbines is treated as a variable dependent on the discharged flows. The developed solution algorithm uses an iterative approach that solves in each iteration a linearized HSP problem using the linprog function of the MATLAB (R) Optimization Toolbox. In each iteration, the value of the head to use in the next iteration is updated. The paper reports results from a realistic Case Study based on the cascade of 9 hydro stations (4 of them with pumping) installed in the Portuguese section of the Douro River. en
dc.identifier.uri http://repositorio.inesctec.pt/handle/123456789/4927
dc.language eng en
dc.relation 268 en
dc.rights info:eu-repo/semantics/openAccess en
dc.title Optimization of Cascaded Hydro Units Modeled as Price Makers Using the linprog Function of MATLAB (R) and Considering the Tailwater Effect en
dc.type conferenceObject en
dc.type Publication en
Files
Original bundle
Now showing 1 - 1 of 1
Thumbnail Image
Name:
P-00N-2E8.pdf
Size:
344.57 KB
Format:
Adobe Portable Document Format
Description: